BESS manufacturing & EPC · Ahmedabad, India

Grid-scale battery storage, built end to end in India.

GESS turns LFP cells into modules, modules into 418 kWh racks and racks into 5 MWh containerised blocks — assembled, tested and commissioned from our Ahmedabad facility.

Per block
5.0 MWh
Cycle life
6,000
Group solar
1 GW+
Representative render of a GESS 20-foot containerised battery storage block
Fig. 01 — Block 5.0, 20-ft DC block Representative render
Racks
12
DC voltage
1,331 V
Footprint
20 ft ISO
Target capacity
5GWh / yr
Energy per block
5.016MWh
Cycle life
6,000cycles
Group solar assembly
1GW+

Capacity is a 2028 target, not current output. Cycle life at 25 °C, 0.5C, 80% depth of discharge. Certification status per product and market is confirmed in writing — see compliance.

Why GESS

A manufacturer, not a reseller.

Most storage offers in India are assembled from imported components by parties who own none of the design. We own the assembly, the test bench and the warranty — and we sit on one side of the contract.

01

We build every layer above the cell

Module assembly, rack integration, thermal design, BMS configuration, container build and factory acceptance testing all happen under one roof in Ahmedabad. One bill of materials, one traceability chain, one warranty.

02

One contract, one accountable party

Design, supply, civil and balance-of-plant, installation, commissioning and O&M sit inside a single EPC scope. Nobody gets to arbitrate an interface between a cell vendor, an integrator and an electrical contractor.

03

Operators behind the plant

The promoters built Ganesh Green Bharat's ~1 GW solar module assembly line and Pacifica's infrastructure portfolio. GESS inherits that supplier base, that quality discipline and that balance sheet.

Systems

Three products, one architecture.

The same cell, module and BMS platform runs from 8 kWh to 5 MWh. Buy the layer you need, or the whole block.

01 / Module

Module 8.0

8.04 kWh, 25.6 V, 314 Ah LFP prismatic cells in 8S1P. Aluminium cold plate, cell-level fusing, laser-welded busbars.

  • 8.04 kWh nominal
  • 25.6 V · 314 Ah
  • IP20, serviceable in rack

02 / Rack

Rack 418

52 modules on a serviceable steel rack: 1P416S at 1,331.2 V, with rack-level BMS, DC breaker and coolant manifold.

  • 418 kWh nominal
  • 1,331.2 V DC
  • Rack BMS, Modbus / CAN

03 / Block

Block 5.0

A complete 20-ft DC block: 12 racks, liquid cooling, aerosol detection, suppression, deflagration venting and a single DC interface.

  • 5.016 MWh nominal
  • 12 racks · 20-ft ISO
  • FAT before dispatch

Architecture

From cell to grid connection.

Energy storage fails at the seams — between module and rack, rack and block, block and inverter. We design those seams ourselves.

  1. L0 Cell314 Ah LFP prismatic, graded on capacity and DCIR at goods-in 3.2 V · 314 Ah
  2. L1 Module8S1P module, cold plate, cell-level fusing, laser-welded busbars 8.04 kWh
  3. L2 Rack52 modules, rack BMS, DC breaker, coolant manifold, service access 418 kWh
  4. L3 Block12 racks, thermal management, detection and suppression, DC interface 5.016 MWh
  5. L4 Plantn blocks with PCS, transformer, protection and an EMS/SCADA layer kV → MW
Single-line diagram: DC blocks feed a power conversion system, a transformer and the grid, coordinated by an energy management system. DC BLOCK 5.0 MWh 1,331 V DC PCS 4.2 MW bi-directional TRANSFORMER 0.69 / 33 kV step-up GRID 33 kV metering point EMS / SCADA n = blocks per plant · typically 2–40 · configured to the PPA or tender
Fig. 02 — Plant topology, indicative

Solar + storage

Sun in, storage out.

A block does not care where the electrons come from — only when they arrive. Coupled to a solar array it absorbs the midday peak and holds it for the evening, which is the difference between a generation asset and a dispatchable one.

A solar array charging two GESS containerised battery blocks, which then export to the grid. Sunlight falls on a five-by-two photovoltaic array. A direct-current connection runs to two 20-foot battery containers whose charge indicators pulse, and a step-up connection continues to a transmission pylon. GESS PV ARRAY · DC BLOCK 5.0 × 2 33 kV
Fig. 07 — Solar array charging two Blocks, then exporting Indicative

Charge window

09:00 to 16:00, absorbing the midday peak that would otherwise be curtailed.

Dispatch window

18:00 to 22:00, when the evening tariff and the grid both need it most.

DC round-trip

≥ 95% measured at factory acceptance, verified again at commissioning.

Manufacturing

Built in Ahmedabad. Tested before it ships.

Nothing leaves the facility without a factory acceptance test record: full charge and discharge, insulation resistance, thermal performance and a communications check.

  1. 01

    Incoming cell QA

    Capacity, DCIR, open-circuit voltage and dimensional checks on every lot.

  2. 02

    Module assembly

    Stacking, laser welding, fusing and cold-plate bonding on a single line.

  3. 03

    Rack integration

    52 modules, BMS harness, breaker and coolant manifold, torque-audited.

  4. 04

    Container build

    12 racks, HVAC, detection, suppression and venting inside the 20-ft shell.

  5. 05

    Factory acceptance

    Capacity, round-trip efficiency, insulation, thermal and comms, witnessed.

  6. 06

    Dispatch & commission

    Protected transport, site installation, grid compliance tests and handover.

Facility

Ahmedabad, Gujarat — module, rack and container integration under one roof

Test capability

Full charge/discharge, HiPot, thermal cycling and communications verification

Traceability

Cell-to-block serialisation, retained for the life of the asset

Inside the facility

Applications

Where the blocks go.

The same DC platform serves a 250 MWh utility tender and a 2 MWh factory peak-shaving system. What changes is the plant configuration, not the battery.

Utility-scale

Solar and wind co-location, peak shifting and capacity contracts, configured to state tender and grid-code requirements.

Commercial & industrial

Demand-charge reduction, DG displacement and backup for plants, campuses and cold storage — sized to the load profile.

Solar + storage

DC-coupled and AC-coupled architectures that convert an intermittent solar block into a dispatchable one.

Grid services

Frequency response, ramp support and reactive power, on a PCS and controls platform selected for the connection study.

Solutions and EPC scope

Backing

Who stands behind the warranty.

Indian buyers underwrite the parent, not the brochure. GESS is promoted by two operating groups with assets in Gujarat and across India.

Ganesh Green Bharat Ltd

~1 GW of solar module assembly capacity, with an established cell and module supplier base.

Pacifica Companies

Large-scale infrastructure development, project finance and EPC contracting experience.

Qualification

What we can prove, and what we will not claim.

We do not display certificates we do not hold. Certification status is confirmed per product and per market, in writing, before contract. During technical due diligence we supply the type-test reports, declarations of conformity and factory acceptance records for the exact configuration being procured.

Ask for the qualification pack. Standards framework, test regime, FAT procedure and traceability method — sent as documents, not logos. Request it.

Directors

Leadership

Three directors, each with an operating record in the part of the business they run.

Ketan Patel

Founder & Managing Director

Founder of Ganesh Green Bharat Ltd, with more than 1 GW of solar module assembly built and running. Runs manufacturing, supply chain and quality at GESS.

Rocky Israni

Founder & Managing Director

Founder of Pacifica Companies, a large-scale infrastructure and real estate group. Runs project delivery, contracting and finance.

Shaurya Handa

Full-time Founder and Director

Leads BESS technology, product strategy and strategic partnerships across the storage value chain.

Company, group and governance

Plan

What we are building, and when.

Stated as a plan, not a history. Each phase is gated on the previous one passing qualification.

2026

Facility and module line

Ahmedabad facility commissioned. Module assembly and rack integration qualified. First factory acceptance tests.

2027

Container integration

Block 5.0 line live. Type-testing completed for target markets. First utility and C&I deployments.

2028

Scale to 1 GWh

Second shift on module and rack lines. Sodium-ion qualification begins for cost-sensitive segments.

2030

5 GWh target

Annual capacity at 5 GWh across module, rack and container lines, with domestic cell sourcing under evaluation.

Next step

Send us the load profile.

Tell us the site, the tariff or the tender, and the energy and power you need. We will come back with a block count, a layout and an indicative price — usually within a week.